An 8 week full fit installation of a new terrazzo floor, walls, ceilings including back wall counters, a new café and sushi bar.
A 12 week D&B project that delivered the realisation of Waitrose’s long-awaited vision, to create a state-of-the-art development kitchen, within their Bracknell head office campus.
A 25 week D&B refurbishment project undertaken with sectional completion dates to allow a staged occupation of the new Waitrose Customer Fulfilment Centre.
A hugely challenging project , that required us to hit the ground running, after the previous main contractor had left the project with 5 weeks left to start on site. Full store and back of house refurbishment including new eComm storage and pick-ups.
Over a 5 week shutdown, UC Build carried out a full strip out and refurbishment of Waitrose’s Key store in North London on Finchley Road. This project is truly Fastrack in every aspect delivering high quality in every aspect. The stores new concepts in Meat Fish, Sushi, Fresh Fruit and Veg, are dazzling with new click and collect and online delivery concepts.
Phased redevelopment of the flagship Kings road store in Chelsea, the project took place over 3 years while the developer created the new store space. In this time UCB created a temporary store and then formed the entire new store with all the latest finishes and service counters